Back To Top
COMPLETED 2024
- Approximately *16,000 m3 of metals and boron-impacted soil will be transported by truck to the LTWMF
- Waste deposited by Port Hope Sanitary, later Crane, which made cast-iron bathtubs in a factory on the Centre Pier
BEFORE

AFTER
