Back To Top

Lions Centre Park

Back To Map
  • Approximately *16,000 m3 of metals and boron-impacted soil will be transported by truck to the LTWMF
  • Waste deposited by Port Hope Sanitary, later Crane, which made cast-iron bathtubs in a factory on the Centre Pier