Centre Pier Temporary Storage Site
COMPLETED 2018 Approximately 19,800 m3 LLRW in the Temporary Storage Site Remediation/Restoration Plan Removal of the Temporary Storage Site and all...
The Port Hope Project involves the cleanup of historic low-level radioactive waste identified at major, industrial and small-scale sites within the Municipality of Port Hope.
Sites where waste is previously known to have existed based on historical file review are classified as Major Sites.
In addition, there are four Known Sites which have been identified through earlier radiological investigations and are included as part of the Port Hope Project.
CNL is also responsible for the cleanup and long-term management of non-radioactive industrial waste from five Industrial Sites in Port Hope.
These sites will be cleaned up and the waste will be transported to the Long-Term Waste Management Facility for safe, long-term management.
COMPLETED 2018 Approximately 19,800 m3 LLRW in the Temporary Storage Site Remediation/Restoration Plan Removal of the Temporary Storage Site and all...
Approximately *1,800 m3 sludge and contaminated soil will be transported by truck to a licensed storage facility Waste deposited...
SITE PLAN Remove approximately 21,000 m3 of LLRW including mound alongside John St. ...
Approximately *5,700 m3 soil contaminated with hydrocarbons will be transported by truck to a licensed hazardous waste management facility ...
The Highland Drive Landfill houses 51,900 m3 of LLRW co-mingled or overlain by municipal solid waste (MSW) Operated as...