Back To Top

Dust Monitoring Results – Port Hope Project LTWMF Construction


How to read the results

2021


January
4-811-1518-2225-29

February
1-58-1216-1922-26

March
1-58-1215-1922-25

April
29(Mar)-15-912-1619-2326-30

May
3-8 ​• 10-1417-2225-29

June
31(May)-57-11 ​• 14-1821-25

July
28(June)-25-9 ​• 12-1619-23 26-30

August
3-69-13

September
1-3 • 6-1013-1720-24

October
27(Sept)-14-811-1518-2225-29

November
1-5 8-1215-1922-26

December
29(Nov)-3 • 6-1013-1720-24

ARCHIVE